|
Brighton Air
Conditioning, Inc. has been completed the mechanical portion of the 2-
story MLA Design Center
Project in West Palm Beach, FL. Mechanical scope included (75) tons of roof
top equipment, VAV Boxes, Automated Control
System, Fire Smoke Dampers, Air Distribution etc. Brighton's sheet
metal shop was responsible for fabricating over 7,500 lbs of sheet metal duct
for the project. Miller Construction Company was the general
contractor.
|