|
Arellano Construction
has selected Brighton Air Conditioning as the HVAC contractor for (2)
ground up buildings for the Community Blood Center of South
Florida. The Miami location scope includes (27.5) tons roof top
equipment, VVT boxes, automated HVAC control system, etc. Lake
Osbourn location includes (25) tons roof top equipment, VVT boxes, and
fully automated HVAC control system. Brighton will be responsible
for fabricating and installing more than 11,000 lbs of sheet metal for
the projects. Both locations also include generator exhausting, full air distribution,
exhaust, outside air louvers, fire dampers, louvers.

|