|
Brighton Air
Conditioning, Inc. has been selected as the HVAC contractor for the new
21,100 SF Calvary Chapel in Boynton Beach. HVAC scope to include
(83.5) tons rooftop package & split system equipment, sheet metal
duct work, duct sock distribution system, and associated distribution
systems.
|